MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
ERC amends net-metering rules to expand renewable energy options
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
ERC amends net-metering rules to expand renewable energy options
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner., This news data comes from:http://xbko-nknf-io-riu.yamato-syokunin.com
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.

In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Philippine forces deliver supplies and personnel to disputed South China Sea shoal despite tensions
- Bersamin letter proves Torre reassignments ‘valid’
- UN watchdog finds uranium traces at suspected Syrian former nuclear site
- Lacson to govt: Protect education budget
- Comelec probes 15 govt contractors over 2022 election donations
- Thai PM Paetongtarn Shinawatra sacked; new turmoil feared
- Search for survivors after Afghan earthquake kills 800
- Ukraine drone attacks spark fires at Russia's Kursk nuclear plant, Novatek's Ust-Luga terminal.
- Trump wants to meet Norea Korea's Kim again
- Harold Cabreros takes post as new OCD chief